Overall Company Progress on Commitments

The Commitment Progress Tracker evaluates how well a company is delivering on its promises by comparing management’s stated commitments from press releases and earnings calls to actual progress updates. This tool categorizes commitments into clear ratings such as “On Track” or “Exceeded Expectations” while flagging potential risks where execution may be falling short.

By highlighting progress and warning signs, the Commitment Progress Tracker provides retail investors with actionable insights to assess a company’s performance. With a sliding 18-month window of data, it serves as a valuable educational resource to support informed investment research.

Cluster: Gravity Market Launches and Customer Access

Commitment: September 08, 2025: Unveil Lucid Gravity in Europe with a German premiere at IAA Munich and open orders immediately, with first European deliveries beginning early 2026.

✅ On Track | Certainty: 95%

Analysis: European debut occurred as planned at IAA Munich, with orders opened. Delivery timing of early 2026 reaffirmed. No conflicting evidence.

Progress:

  • A recent update from 2025-09-08 confirms the Munich debut, orders open in Europe, and deliveries expected to begin early 2026.
  • Earlier evidence from 2024-11-07 indicated U.S. order opening and late-2024 SOP; the 2025-09-08 European specifics are additive, not conflicting.

Commitment: September 08, 2025: Announce European pricing and leasing options for Gravity Grand Touring (e.g., Germany €116,900; leasing from €1,169/month incl. VAT), with Touring pricing published and availability to follow later.

✅ On Track | Certainty: 95%

Analysis: Country-specific GT and Touring pricing and example leasing terms were published; Touring availability timing remains “later,” consistent with staged rollout.

Progress:

  • A recent update from 2025-09-08 lists GT and Touring pricing in Germany, Netherlands, Switzerland, and Norway; example German lease from €1,169/month.

Commitment: September 08, 2025: Open orders for Gravity Grand Touring via Lucid’s website and Studios across Europe, with Gravity Touring to be made available at a later date.

✅ On Track | Certainty: 95%

Analysis: Orders for GT are open Europe-wide via web and Studios. Touring availability is explicitly “later,” consistent with plan.

Progress:

  • A recent update from 2025-09-08 confirms GT ordering is live in Europe; Touring to follow.

Commitment: February 14, 2025: Launch Gravity Grand Touring in Canada with orders open now, starting at $134,500 CAD.

✅ On Track | Certainty: 90%

Analysis: Canadian ordering opened with pricing. No newer contradictory updates.

Progress:

  • Earlier evidence from 2025-02-14 confirms Canadian ordering live for GT at $134,500 CAD.

Commitment: February 14, 2025: Plan introduction of Gravity Touring in Canada in late 2025, starting at $113,500 CAD.

✅ On Track | Certainty: 80%

Analysis: Planned late-2025 availability remains pending; no slippage reported to date.

Progress:

  • Earlier evidence from 2025-02-14 states Touring planned for late 2025 at $113,500 CAD; no newer updates to timing.

Commitment: November 07, 2024: Open customer orders for Gravity Grand Touring in the U.S. with production slated to start at the end of 2024, and confirm Touring production planned for late 2025.

✅ On Track | Certainty: 98%

Analysis: U.S. orders opened and SOP occurred in December 2024; Touring production still planned for late 2025.

Progress:

  • Earlier evidence from 2024-11-07 confirms U.S. order opening and end-2024 SOP plan.
  • A recent update from 2025-04-30 states commercial production of Gravity began in December 2024, confirming SOP timing (newer data validates the plan).

Cluster: Autonomous Robotaxi Program with Uber and Nuro

Commitment: September 04, 2025: Confirm the robotaxi will be built at Lucid’s Arizona facility, operate exclusively on Uber’s platform, and is expected to first launch later next year in a major U.S. city.

✅ On Track | Certainty: 90%

Analysis: Partnership details and first-launch timing were reconfirmed alongside Uber’s investment close; execution milestones ahead.

Progress:

  • A recent update from 2025-09-04 confirms Arizona build, Uber exclusivity, and first launch “later next year.”

Commitment: September 04, 2025: Note Uber’s deployment target of 20,000 or more Lucid vehicles over six years through the program, supported by Uber’s $300 million investment in Lucid.

✅ On Track | Certainty: 95%

Analysis: Investment closed and deployment target reaffirmed; consistent with earlier targets.

Progress:

  • A recent update from 2025-09-04 confirms the $300M Uber investment closed and the 20,000+ vehicle deployment aim over six years.

Commitment: August 16, 2025: Commit to deliver a minimum of 20,000 Lucid Gravity Plus vehicles to Uber over six years following start of production targeted for late 2026.

✅ On Track | Certainty: 85%

Analysis: Delivery commitment is long-dated; current evidence shows agreements and funding in place; SOP target remains late 2026.

Progress:

  • A recent update from 2025-08-16 (MD&A) details the 20,000-vehicle purchase framework and SOP target.
  • A recent update from 2025-09-04 reinforces program funding and deployment scale (reaffirms trajectory).

Commitment: August 06, 2025: Reiterate late next year timing for first robotaxi vehicles and Uber’s plan to deploy a minimum of 20,000 vehicles over six years (reaffirmed and refined by September 04, 2025).

✅ On Track | Certainty: 90%

Analysis: Timeline and scale were restated on 2025-09-04; newer data supersedes earlier phrasing but not substance.

Progress:

  • Earlier evidence from 2025-08-06 set late-next-year first vehicles and 20,000+ plan.
  • A recent update from 2025-09-04 reaffirms timing and investment, superseding the earlier reiteration.

Commitment: July 17, 2025: Announce Uber’s aim to deploy 20,000+ Lucid vehicles equipped with Nuro Driver over six years, with first launch scheduled for next year in a major U.S. city, alongside multi‑hundred‑million‑dollar investments in Nuro and Lucid.

✅ On Track | Certainty: 90%

Analysis: Initial announcement has since been reinforced by the 2025-09-04 investment close; scope and timing remain consistent.

Progress:

  • Earlier evidence from 2025-07-17 announced the 20,000+ deployment aim and first launch next year.
  • A recent update from 2025-09-04 confirms Uber’s $300M investment in Lucid and exclusive platform operation, strengthening the program.

Cluster: Brand and Marketing Partnerships

Commitment: September 04, 2025: Enter into a multi‑year partnership with Timothée Chalamet as Lucid’s first‑ever global brand ambassador and feature him in upcoming multi‑format campaign content.

🌟 Exceeded Expectations | Certainty: 95%

Analysis: Partnership not only entered; campaign “Driven” launched with multi-format content directed by James Mangold.

Progress:

  • A recent update from 2025-09-04 shows campaign launch featuring Chalamet (beyond “upcoming”).

Commitment: August 06, 2025: Confirm the Chalamet-led global brand campaign to launch in early September to stimulate near‑term demand and anchor the brand in popular culture (superseded by September 04, 2025 launch).

✅ On Track | Certainty: 95%

Analysis: Campaign launched on 2025-09-04; newer update supersedes the preview and confirms execution.

Progress:

  • Earlier evidence from 2025-08-06 previewed an early-September launch.
  • A recent update from 2025-09-04 confirms the campaign launched, superseding the preview.

Commitment: August 05, 2025: Initiate a significant brand awareness push featuring Timothée Chalamet as first global brand ambassador to strengthen market presence.

✅ On Track | Certainty: 90%

Analysis: The push materialized with the 2025-09-04 campaign launch and content distribution.

Progress:

  • Earlier evidence from 2025-07-29 announced the partnership.
  • A recent update from 2025-09-04 confirms the campaign execution, advancing the awareness push.

Commitment: July 29, 2025: Establish a multi‑year partnership with Timothée Chalamet as the first Global Brand Ambassador, with the campaign premiering in early fall 2025.

✅ On Track | Certainty: 95%

Analysis: Partnership established; campaign premiered in early September, meeting the “early fall” window.

Progress:

  • Earlier evidence from 2025-07-29 confirms the partnership and fall timing.
  • A recent update from 2025-09-04 confirms the campaign premiere (supersedes timing preview).

Cluster: Production, Guidance, and CapEx

Commitment: August 16, 2025: Guide 2025 capital expenditures to approximately $1.1–$1.2 billion, prioritizing high‑return programs (updates and supersedes April 30, 2025 guidance of ~$1.4 billion).

✅ On Track | Certainty: 95%

Analysis: CapEx guidance reduced and reaffirmed; explicitly supersedes earlier $1.4B figure.

Progress:

  • A recent update from 2025-08-16 (MD&A) guides CapEx to $1.1–$1.2B, superseding 2025-04-30.

Commitment: August 06, 2025: Refine 2025 CapEx guidance to $1.1–$1.2 billion and continue disciplined prioritization of critical programs (consistent with August 16, 2025 MD&A).

✅ On Track | Certainty: 95%

Analysis: Guidance refinement consistent with the later MD&A; alignment confirms stability.

Progress:

  • Earlier evidence from 2025-08-06 refined CapEx to $1.1–$1.2B.
  • A recent update from 2025-08-16 maintains the same range (consistency increasing certainty).

Commitment: August 05, 2025: Adjust 2025 production outlook to 18,000–20,000 vehicles to reflect market conditions and execution plans (supersedes prior flat 20,000 guidance).

✅ On Track | Certainty: 95%

Analysis: Production guidance updated and carried into Q2 disclosures.

Progress:

  • A recent update from 2025-08-05 sets the 18,000–20,000 range.
  • A recent update from 2025-08-06 reiterates the updated range in the earnings call.

Commitment: May 06, 2025: Target production of approximately 20,000 vehicles in 2025 as part of Q1 commentary (superseded by August 05, 2025 update).

🟡 Partially Met | Certainty: 90%

Analysis: Original ~20,000 target was revised to a range of 18,000–20,000 on 2025-08-05; newer guidance supersedes the earlier figure.

Progress:

  • Earlier evidence from 2025-05-06 targeted ~20,000 vehicles.
  • A recent update from 2025-08-05 supersedes with 18,000–20,000; newer data takes precedence.

Commitment: February 25, 2025: Commit to producing approximately 20,000 vehicles in 2025 while improving gross margins and strengthening the balance sheet (superseded by August 05, 2025 update).

🟡 Partially Met | Certainty: 90%

Analysis: The ~20,000 goal remains within the later 18,000–20,000 range, but the exact single-point target was refined; superseded by newer guidance.

Progress:

  • Earlier evidence from 2025-02-25 set ~20,000.
  • A recent update from 2025-08-05 adjusted to 18,000–20,000 (supersedes).

Commitment: April 30, 2025: Anticipate approximately $1.4 billion in 2025 capital expenditures to support capacity and product development (superseded by August 16, 2025 guidance).

🟡 Partially Met | Certainty: 95%

Analysis: CapEx outlook was lowered to $1.1–$1.2B on 2025-08-16; newer guidance supersedes April projection.

Progress:

  • Earlier evidence from 2025-04-30 anticipated ~$1.4B CapEx.
  • A recent update from 2025-08-16 revises to $1.1–$1.2B, explicitly superseding April.

Cluster: Vehicle Technology, ADAS, and Charging

Commitment: September 08, 2025: Make DreamDrive 2 standard across all Lucid models in conjunction with Gravity’s European debut, leveraging NVIDIA DRIVE AGX and DriveOS.

✅ On Track | Certainty: 80%

Analysis: DreamDrive 2 was introduced with NVIDIA; “standard across all models” positioning announced. Broader rollout implied; direct confirmation of “standard on all” is inferred from launch communications.

Progress:

  • A recent update from 2025-09-08 introduced DreamDrive 2 with NVIDIA DRIVE AGX.
  • Earlier evidence from 2025-07-15 shows significant ADAS feature rollouts via OTA, supporting standardization momentum.

Commitment: September 08, 2025: Guarantee ongoing over‑the‑air software updates to continually enhance Lucid UX 3.0 and in‑vehicle features.

✅ On Track | Certainty: 90%

Analysis: Pattern of OTA updates (Android Auto, ADAS features) supports the guarantee; commitment reaffirmed at European debut.

Progress:

  • A recent update from 2025-09-08 reiterates ongoing OTA enhancements.
  • Earlier evidence from 2025-06-16 (Android Auto rollout) and 2025-07-15 (ADAS OTA) demonstrate active OTA cadence.

Commitment: September 08, 2025: Implement a 926‑volt architecture with a patented solution for legacy charger compatibility to enable class‑leading performance.

✅ On Track | Certainty: 95%

Analysis: 926V architecture and compatibility solutions have been detailed and reiterated; consistent with prior Gravity charging disclosures.

Progress:

  • A recent update from 2025-09-08 confirms 926V architecture and compatibility approach.
  • Earlier evidence from 2025-04-15/2025-01-28 details 926V charging on 1000V equipment and compatibility with 500V networks.

Commitment: September 08, 2025: Deliver peak charging enabling up to 400 kilometers in 14 minutes with up to 400 kW power and 926 V maximum voltage.

✅ On Track | Certainty: 90%

Analysis: Claimed charging performance aligns with prior statements (e.g., 200 miles in under 11 minutes); no contradictory data.

Progress:

  • A recent update from 2025-09-08 states up to 400 km in 14 minutes, up to 400 kW at 926V.
  • Earlier evidence from 2025-04-15 cites 200 miles in under 11 minutes at up to 400 kW; consistent.

Commitment: July 22, 2025: Provide Lucid Air owners access to the Tesla Supercharger network starting July 31, 2025 via a Lucid‑approved adapter, charging up to 50 kW and gaining up to 200 miles per hour.

✅ On Track | Certainty: 90%

Analysis: Access date and performance parameters announced; no subsequent issues reported.

Progress:

  • Earlier evidence from 2025-07-22 confirms Tesla Supercharger access for Air starting 2025-07-31 via adapter.

Commitment: July 15, 2025: Roll out Hands‑Free Drive Assist and Hands‑Free Lane Change Assist to Lucid Air via OTA on July 30, 2025, with Gravity to follow later in the year.

✅ On Track | Certainty: 85%

Analysis: OTA schedule announced and consistent with broader ADAS roadmap; no later contradictions.

Progress:

  • Earlier evidence from 2025-07-15 schedules the OTA rollout for Air on 2025-07-30; Gravity to follow later in 2025.
  • A recent update from 2025-09-08 on DreamDrive 2 supports continued ADAS expansion.

Commitment: June 16, 2025: Begin rollout of Android Auto compatibility to enhance the infotainment experience based on owner feedback.

✅ On Track | Certainty: 95%

Analysis: OTA began as announced; ongoing software cadence corroborates.

Progress:

  • Earlier evidence from 2025-06-16 confirms Android Auto rollout via OS 2.7.0.

Commitment: April 15, 2025: Equip 2026 Gravity with proprietary charging up to 400 kW on 1000 V equipment, adding 200 miles in under 11 minutes.

✅ On Track | Certainty: 95%

Analysis: Charging specs for 2026 Gravity consistently reiterated; no slippage indicated.

Progress:

  • Earlier evidence from 2025-04-15 provides detailed charging specs; later 2025-09-08 aligns on performance.

Commitment: January 28, 2025: Enable Gravity owners to access 20,000+ Tesla Superchargers without an adapter starting January 31, 2025, alongside bi‑directional charging up to 19.2 kW (80 A).

✅ On Track | Certainty: 95%

Analysis: NACS port access date and bi-directional charging capability announced; no contrary updates.

Progress:

  • Earlier evidence from 2025-01-28 confirms native NACS access for Gravity from 2025-01-31 and 19.2 kW bi-directional charging.

Commitment: September 08, 2025: Continue in‑house development and manufacturing of next‑gen proprietary EV technology to support performance and differentiation.

✅ On Track | Certainty: 90%

Analysis: Technology leadership reiterated; supported by internal architecture and charging developments.

Progress:

  • A recent update from 2025-09-08 emphasizes in-house next-gen tech alongside DreamDrive 2 and 926V architecture.

Cluster: Manufacturing Footprint and Supply Chain Localization

Commitment: August 16, 2025: Expand manufacturing footprint through Arizona facility acquisitions and ongoing integration following April 2025 employment offers to former Nikola employees.

✅ On Track | Certainty: 90%

Analysis: Integration ongoing following April acquisition of Nikola facilities and offers to 300+ employees.

Progress:

  • A recent update from 2025-08-16 (MD&A) notes ongoing integration and footprint expansion.
  • Earlier evidence from 2025-04-11 details acquisition of >884,000 sq ft of Nikola facilities and employment offers.

Commitment: August 16, 2025: Continue constructing the AMP‑2 plant in Saudi Arabia with milestones set toward operational commencement and complete vehicle production.

✅ On Track | Certainty: 85%

Analysis: AMP-2 construction progress reiterated; milestone-based support continues.

Progress:

  • A recent update from 2025-08-16 references ongoing AMP-2 construction and milestones.
  • Earlier evidence from 2025-02-25/2025-04-30 confirms international manufacturing progress and support tied to milestones.

Commitment: August 16, 2025: Optimize supply chain and manufacturing plans amidst economic uncertainties through ongoing operational improvements.

✅ On Track | Certainty: 80%

Analysis: Management highlights ongoing operational optimization in MD&A; no conflicting data.

Progress:

  • A recent update from 2025-08-16 MD&A discusses supply chain/manufacturing plan optimization.

Commitment: August 16, 2025: Hire additional sales, customer service, and service center personnel to support growth and service delivery.

✅ On Track | Certainty: 75%

Analysis: Stated hiring intent; specific headcount outcomes not yet reported in provided summaries.

Progress:

  • A recent update from 2025-08-16 indicates plans to hire across sales and service; prior facility expansion supports capacity needs.

Commitment: August 06, 2025: Advance domestic supply chain by securing U.S. natural and synthetic graphite sourcing beginning in 2028 via Graphite One (reaffirming June 04, 2025 agreements).

✅ On Track | Certainty: 90%

Analysis: June agreements reaffirmed in August; timeline to 2028 remains.

Progress:

  • Earlier evidence from 2025-06-04 details Graphite One agreement (natural graphite) and domestic sourcing strategy.
  • A recent update from 2025-08-06 reiterates U.S. graphite sourcing starting 2028.

Commitment: July 23, 2025: Advance domestic mineral production, expand coordination between mining and automotive sectors, and support qualification/procurement of U.S. materials under the MINAC collaboration.

✅ On Track | Certainty: 85%

Analysis: Collaboration announced; objective-focused progress underway.

Progress:

  • Earlier evidence from 2025-07-23 announces MINAC initiative to strengthen U.S. materials supply chains.

Commitment: June 04, 2025: Enter multi‑year agreements for American‑sourced natural and synthetic graphite with production expected in 2028, and collaborate with Syrah Resources for natural graphite AAM starting in 2026.

✅ On Track | Certainty: 90%

Analysis: Multi-year graphite sourcing agreements established with staggered start dates (2026 AAM; 2028 domestic).

Progress:

  • Earlier evidence from 2025-06-04 details agreements with Graphite One and collaboration with Syrah Resources.

Commitment: April 11, 2025: Acquire more than 884,000 square feet of former Nikola facilities in Arizona and plan to offer employment to 300+ former Nikola employees to expand manufacturing and development capacity.

✅ On Track | Certainty: 95%

Analysis: Acquisition completed and hiring plan announced; subsequently referenced in August integration updates.

Progress:

  • Earlier evidence from 2025-04-11 confirms asset acquisition and employment offers.
  • A recent update from 2025-08-16 indicates ongoing integration.

Commitment: February 25, 2025: Maintain progress on establishing international manufacturing at AMP‑2 in Saudi Arabia with economic support tied to milestone completion.

✅ On Track | Certainty: 85%

Analysis: AMP-2 progress reiterated later; milestone-based incentives remain in place.

Progress:

  • Earlier evidence from 2025-02-25 acknowledges AMP-2 progress with milestone-linked support.
  • A recent update from 2025-08-16 confirms continued construction and milestones.

Cluster: Capital Markets and Balance Sheet Management

Commitment: August 21, 2025: Execute a 1‑for‑10 reverse stock split effective August 29, 2025, reducing outstanding shares from ~3,072.6 million to ~307.3 million and commencing split‑adjusted trading on September 2, 2025.

✅ On Track | Certainty: 85%

Analysis: Board and stockholder approvals obtained; effectiveness and split-adjusted trading dates specified. Provided evidence states “expected to be effective” (no post‑effective confirmation in sources).

Progress:

  • A recent update from 2025-08-21 announces approvals and effective dates; execution expected 2025-08-29.

Commitment: August 21, 2025: Reduce authorized common shares from 15 billion to 1.5 billion concurrent with the reverse split to align with the new share count.

✅ On Track | Certainty: 85%

Analysis: Authorized share reduction approved concurrent with split; awaiting post‑effective confirmation.

Progress:

  • A recent update from 2025-08-21 details the authorized share reduction alongside the split.

Commitment: August 21, 2025: Provide cash‑in‑lieu for fractional shares and appoint Equiniti Trust Company, LLC as exchange agent, with no action required by registered stockholders.

✅ On Track | Certainty: 85%

Analysis: Administrative mechanics communicated; consistent with standard practice.

Progress:

  • A recent update from 2025-08-21 names Equiniti as exchange agent and cash‑in‑lieu treatment.

Commitment: July 17, 2025: Present a preliminary proxy to propose a 1‑for‑10 reverse stock split subject to stockholder approval (superseded by August 21, 2025 execution).

✅ On Track | Certainty: 95%

Analysis: Proxy proposal progressed to stockholder approval and execution planning by 2025-08-21; newer action supersedes proposal stage.

Progress:

  • Earlier evidence from 2025-07-17 filed the preliminary proxy.
  • A recent update from 2025-08-21 confirms approval and effective date (supersedes proposal).

Commitment: April 09, 2025: Close $1.1 billion of convertible senior notes due 2030 and commit to use proceeds for general corporate purposes while strengthening partnership with PIF.

✅ On Track | Certainty: 95%

Analysis: Offering closed; proceeds allocated per plan (including repurchase of 2026 notes).

Progress:

  • Earlier evidence from 2025-04-08 confirms the $1.1B close and use of proceeds, including repurchases.

Commitment: April 03, 2025: Price convertible senior notes and allocate approximately $935.6 million to repurchase ~$1,052.5 million of 2026 notes, enter capped calls (cap price $4.80), and arrange a $430 million prepaid forward with Ayar Third Investment Company.

✅ On Track | Certainty: 95%

Analysis: Pricing and structuring executed; later close validates completion.

Progress:

  • Earlier evidence from 2025-04-03 details pricing, repurchase allocation, capped calls, and Ayar prepaid forward.
  • A recent update from 2025-04-08 confirms closing and execution of plan.

Commitment: April 02, 2025: Announce intent to offer $1 billion in convertible senior notes due 2030 with planned capped calls, partial 2026 note repurchases, and a prepaid forward transaction (subsequently priced and closed on April 03 and April 09, 2025).

✅ On Track | Certainty: 95%

Analysis: Intent quickly moved to pricing and close; subsequent actions supersede the initial announcement.

Progress:

  • Earlier evidence from 2025-04-02 announces the intent and plan.
  • A recent update from 2025-04-03/2025-04-08 confirms pricing and closing (supersedes intent).

Commitment: October 18, 2024: Complete a public offering and concurrent PIF affiliate private placement raising approximately $1.67 billion to extend financial runway into 2026.

✅ On Track | Certainty: 95%

Analysis: Offering and private placement completed; proceeds strengthen liquidity.

Progress:

  • Earlier evidence from 2024-10-18 confirms approximately $1.67B raised via public offering and PIF affiliate private placement.

Cluster: Customer Access, Retail, and Shareholder Engagement

Commitment: August 16, 2025: Continue investing in the direct‑to‑consumer sales and service model by opening additional Studios and expanding the sales force.

✅ On Track | Certainty: 85%

Analysis: MD&A outlines continued DTC investment; recent studio opening supports the trajectory.

Progress:

  • A recent update from 2025-08-16 states continued investment in DTC expansion.
  • Earlier evidence from 2025-05-08 shows a new Studio & Service Center opening (Rutherford, NJ).

Commitment: May 08, 2025: Open a new Studio and Service Center in Rutherford, NJ, marking Lucid’s 43rd permanent North American location and 58th globally.

✅ On Track | Certainty: 99%

Analysis: Facility opened as announced; milestone locations disclosed.

Progress:

  • Earlier evidence from 2025-05-08 confirms the opening and location count.

Commitment: July 02, 2025: Enable shareholders to submit and upvote questions for management on Say Technologies from July 22 to August 4, 2025 for the Q2 earnings call.

✅ On Track | Certainty: 95%

Analysis: Say platform engagement window communicated; aligned with Q2 call.

Progress:

  • Earlier evidence from 2025-07-02 announces the Say Q&A window starting July 22.
  • A recent update from 2025-07-02/2025-07-17 references Say integration around the Q2 call.

Commitment: April 02, 2025: Host shareholder Q&A via Say Technologies from April 22 to May 5, 2025 for the Q1 earnings call.

✅ On Track | Certainty: 95%

Analysis: Q&A window announced; aligns with Q1 call schedule.

Progress:

  • Earlier evidence from 2025-04-02 details Say Q&A dates for Q1.

Commitment: January 06, 2025: Invite shareholder questions via Say Technologies from February 11 to February 23, 2025 ahead of the February 25, 2025 earnings call.

✅ On Track | Certainty: 95%

Analysis: Engagement window announced and timed to Q4/FY call.

Progress:

  • Earlier evidence from 2025-01-06 sets the Say Q&A window ahead of the 2025-02-25 call.

Commitment: October 09, 2024: Expand European market reach through a SIXT partnership adding Lucid Air to the fleet in Germany and opening new Studios and service points across Europe with 100+ mobile Service Hubs in 15 markets.

✅ On Track | Certainty: 95%

Analysis: SIXT fleet partnership in Germany announced; European service expansion noted.

Progress:

  • Earlier evidence from 2024-10-09 confirms SIXT partnership and service network expansion.

Commitment: October 14, 2024: Partner with Four Seasons to provide complimentary Lucid EVs, chauffeured house cars, and hotel charging stations to enhance sustainable guest experiences.

✅ On Track | Certainty: 95%

Analysis: Hospitality partnership announced with program scope and rollout plan.

Progress:

  • Earlier evidence from 2024-10-14 describes the Four Seasons partnership and phased rollout.

Cluster: Leadership and Governance

Commitment: June 05, 2025: Elect Douglas Grimm to the Board of Directors, expanding the board to eight members and adding deep automotive and manufacturing expertise.

✅ On Track | Certainty: 95%

Analysis: Board election completed; expertise profile detailed.

Progress:

  • Earlier evidence from 2025-06-05 confirms election and board composition.

Commitment: May 06, 2025: Strengthen the executive leadership team across marketing, manufacturing engineering, ADAS/AD, and sales/service to drive growth and efficiency.

✅ On Track | Certainty: 95%

Analysis: Multiple leadership appointments announced; roles aligned to growth priorities.

Progress:

  • Earlier evidence from 2025-05-06 lists key leadership hires across functions.

Commitment: February 25, 2025: Initiate search for Lucid’s next CEO while focusing on Gravity production ramp, midsize platform launches, Atlas drive unit development, and aggressive cost reduction.

✅ On Track | Certainty: 85%

Analysis: CEO search initiated; operational focus areas reiterated in subsequent communications.

Progress:

  • Earlier evidence from 2025-02-25 announces the CEO search and strategic priorities.
  • A recent update from 2025-08-06 reflects ongoing execution priorities in earnings commentary.

Commitment: February 13, 2025: Promote Emad Dlala to Senior Vice President of Powertrain to advance drive units, power electronics, and battery systems.

✅ On Track | Certainty: 95%

Analysis: Promotion completed; aligns with powertrain roadmap.

Progress:

  • Earlier evidence from 2025-02-13 confirms Dlala’s promotion and remit.

Commitment: January 28, 2025: Appoint Taoufiq Boussaid as Chief Financial Officer effective February 25, 2025 to align financial strategy with scaling operations and shareholder value.

✅ On Track | Certainty: 95%

Analysis: CFO appointment announced with effective date; financial leadership continuity affirmed.

Progress:

  • Earlier evidence from 2025-01-28 announces appointment and effective date (2025-02-25).

Cluster: Events, Concept Showcases, and Performance Demonstrations

Commitment: August 17, 2025: Unveil a new Gravity‑based concept at Pebble Beach with up to 450 miles of range, 1,828 hp, and 0–60 mph in 3.4 seconds.

✅ On Track | Certainty: 70%

Analysis: A Gravity‑based concept (Gravity X) was publicly shown at Pebble Beach; provided sources confirm the debut but do not explicitly validate the 1,828 hp/0–60 specs. Newer data on concept unveiling supersedes earlier “will unveil” notices.

Progress:

  • Earlier evidence from 2025-08-12 stated a new concept would be unveiled during Monterey Car Week.
  • A recent update from 2025-08-14 confirms Gravity X concept debut at Pebble Beach on 2025-08-17; specific power/acceleration specs are not cited in available summaries.

Commitment: August 14, 2025: Offer public demonstration drives of Lucid Air and Gravity during Monterey Car Week from August 14–17, 2025.

✅ On Track | Certainty: 80%

Analysis: Demonstration drives were scheduled and announced; sources confirm the plan, though not post-event results.

Progress:

  • Earlier evidence from 2025-08-12 confirms public demo drives for Air and Gravity were planned for Aug 14–17.

Commitment: August 14, 2025: Publicly debut the trail‑ready Lucid Gravity X concept at the Pebble Beach Concours d’Elegance on August 17, 2025, showcasing off‑road capability while retaining aerodynamic design.

✅ On Track | Certainty: 95%

Analysis: Gravity X concept was unveiled and publicly displayed on the Concept Lawn at Pebble Beach on Aug 17; off-road features detailed.

Progress:

  • A recent update from 2025-08-14 confirms Gravity X concept unveiling and Pebble Beach public debut on 2025-08-17.

Commitment: July 08, 2025: Achieve a GUINNESS WORLD RECORDS title by driving 1,205 km on a single charge to demonstrate EV efficiency leadership.

✅ On Track | Certainty: 95%

Analysis: Record achieved and documented; reinforces efficiency leadership claims.

Progress:

  • Earlier evidence from 2025-07-08 confirms the 1,205 km single-charge Guinness World Record.